JORDAN HYDROELECTRIC PROJECT

2012 New Hydro of the Year Runner-Up

JIM PRICE HYDRO

NORTH FORK ELECTRIC

KLIENSCHMIDT ENGINEERING

GUS COMMERCIAL DIVERS


Installed new hydroelectric power generating facility on the water intake tower. The new facility consists of two vertical 2.2 Megawatt turbines and generators attached to the water intake tower and is expected to produce 16,900 Megawatt hours of green power per year. 

image39

Past Performances

Buck/Byllesby Dam

image40

 Appalachian Power

 Ivanhoe, VA 

Removed old flashboards and installed eight mechanical Obermeyer Gates.

Norfolk Southern

image41

 Fenton Rigging   

Chattanooga, TN 

Secured sheet pile to bridge pier; patched voids; pumped 300-600 yards per bridge pier footers reinforcements.

Kammer Mitchell

image42

AEP 

Moundsville, WV 

Repaired mooring cells; replaced bumper plates under coal load-out area.

Marmet

image43

 Norfolk Electric 

Kanawha, WV 

Fabricated and installed custom handrails, steps, and floats for trash rakes.

Norfolk Southern

image44

 Fenton Rigging 

Smyrna, GA  

Inspected void under railroad bridge; fabricated and installed steel pier form; drilled and tied rebar mats; filled with concrete; removed civil war era bridge pier compromising water flow. 

Claytor Dam

image45

 Appalachian Power 

Radford, VA  

Install stop logs in trash gate area; installed floating log boom.